0 Items | 0.00
Go

Course Overview



Nortel Ethernet Switching Configuration & Management Boot Camp

Course Code: LANWORK
Duration: 6
Price: Please Call 

Overview 

this bootcamp validates your ability to install, configure and perform day-to-day operational activities of the Nortel Ethernet Switching products.


Pre-Requisites
Basic understanding of data networks

Next Course Dates

Dates available on request. Please contact us






    More Information

    Installing and configuring the following product lists:

    • Ethernet Routing Switch 8600
    • Ethernet Routing Switch 5500
    • Ethernet Routing Switch 4500
    • Ethernet Switch 460/470/470-PWR/470-24T-PWR/470-48T-PWR
    • Day 1:
      • Section 1 Nortel Ethernet Routing Switch 8600 Product Overview
        Unit 1A Chassis Architecture Overview
        Unit 1B Modules overview
        Unit 1C Software Release 4.1 Features
        Lab 1 ERS 8600 Overview
    • Day 2:
      • Section 2 Installing, Managing, and Securing the Ethernet
        Routing Switch 8600
        Unit 2A Installation and Setup
        Unit 2B Using the Boot Monitor and Flags
        Unit 2C Managing the Run-time Configuration
        Unit 2 D Applying Security at Installation
        Lab 2 ERS 8600 Installation and Setup
    • Day 3:
      • Section 3 Configuring a Network Core
        Unit 3A Configuring Layer 2 VLANs
        Unit 3B Breaking Loops at Layer 2, STP, RSTP, MSTP, SLPP
        Unit 3C Configuring Layer 3 IP Interfaces and Protocols
        Lab 3 Configuring a Network Core
    • Day 4:
      • Section 4 Building in Network Reliability
        Unit 4A Configuring MultiLink Trunking (MLT)
        Unit 4B Configuring Link Aggregation
        Unit 4C Configuring Split-MLT (SMLT)
        Unit 4D Configuring VRRP
    • Day 5:
      • Unit 4E Configuring Routed-SMLT (RSMLT)
        Section 5 Providing Quality of Experience to Network
        Applications
        Unit 5A Bandwidth Management (QoS)
        Unit 5B Traffic Filtering
        Lab 5 Configuring QoS on the ERS 8600
    • Day 6:
      • Unit 1: 10/100/1000 L3 Switches (5500 series)
        Lab 1: Configuring Initial IP Information
        Unit 2: basic routing on 5500 series
        Unit 3: Ethernet Resilient Fail-safe 10/100 Stackable Switches (especially 470)
        And some live shows about configuring Vlans and making MLTs


    Copyright © 2010 Synergy Global Professional Services (SAE). Registered in Egypt with company no. 26800.
    RSS. (Srv: 220)